This example site inspection report is interactive. Some parts of it have extra explanatory text. As you read, move your mouse over the text. The extra info will appear in a text box and the part of the document it relates to will be highlighted. Moving your mouse away hides the text box.

 

SITE INSPECTION REPORT

CLIENT DETAILS
Client name: Mr/Mrs/Ms Jake and Barbara Rogers
Client address: 3 Chambers Way
  Albany WA 6330
Client contact: Home 9456 7899 Work 9456 7899 Mobile 0418 641 288
SITE ADDRESS OF PROPOSED WORK
Existing building unticked checkboxyes ticked checkboxno
Vacant land ticked checkboxyes unticked checkboxno
Lot/house no. Lot 179
Street: Chambers Way
Suburb: Albany Postcode 6330

OFFICE REFERENCE

CLIENT REFERENCE #: 2010/ROGJB/002

TYPE OF BUILDING/STRUCTURE
ticked checkboxNew dwelling unticked checkboxGrouped dwelling unticked checkboxAncillary accommodation
unticked checkboxPatio unticked checkboxCarport unticked checkboxGarage
unticked checkboxRetaining Wall unticked checkboxShop unticked checkboxSchool building
unticked checkboxOffice unticked checkboxFit-out unticked checkboxMultiple dwellings
unticked checkboxAddition/alteration to dwelling unticked checkboxFactory unticked checkboxWarehouse
unticked checkboxShed unticked checkboxPergola unticked checkboxOther (specify)
COPY OF CERTIFICATE OF TITLE PROVIDED
ticked checkboxYes unticked checkboxNo
ticked checkboxEasements: (detail): Sewer easement to Water Corp
unticked checkboxCovenants: (detail): _________________________________________________________

OFFICE REFERENCE

Client Reference number: 2010/ROGJB/002

SITE NOTES

BOUNDARY PEGS FOUND
ticked checkboxFront left ticked checkboxFront right
ticked checkboxRear left unticked checkboxRear right unticked checkboxTruncation
unticked checkboxOther (detail): ________________
CORRECT LOT IDENTIFIED ACCORDING TO TITLE
ticked checkboxYes unticked checkboxNo
RE-SURVEY/RE-PEG REQUIRED
ticked checkboxYes unticked checkboxNo
KERBING REQUIRED
ticked checkboxYes unticked checkboxNo
unticked checkboxMountable type kerbing
ticked checkboxNon mountable type kerbing
unticked checkboxKerbing in good condition
ticked checkboxKerbing in poor condition Number of cracks: 8
  Pieces missing: 2
Will a kerbing bond be required? ticked checkboxYes unticked checkboxNo
FOOTPATH
ticked checkboxYes unticked checkboxNo
unticked checkboxFootpath in good condition
ticked checkboxFootpath in poor condition Number of cracks: 5
  Pieces missing: NIL
Will a footpath bond be required? ticked checkboxyes unticked checkboxno
VERGE TREES (detail on site plan)
ticked checkboxYes unticked checkboxNo
Will a bond be required to store materials on the verge (detail on site plan)? unticked checkboxYes ticked checkboxNo
CHECK SOIL TYPE (visual check only)
ticked checkboxSand unticked checkboxClay unticked checkboxGravel unticked checkboxRock unticked checkboxLimestone
unticked checkboxOther (specify): _____________________________________________________
SOIL TEST TO BE PERFORMED?
ticked checkboxYes unticked checkboxNo
VEGETATION REMOVAL (estimation)
unticked checkboxTrees (chainsaw) lopping, remove from site
unticked checkboxShrubs (no of truck loads approx.): ________________
ticked checkboxRubbish (skip bin required)
ticked checkboxTop soil to be stockpiled to back of lot
ROCK REMOVAL (detail on site plan)
unticked checkboxOutcrops of rock present (m³ of rock approx.): _______Nil_____________
TYPE OF SEWERAGE DISPOSAL
ticked checkboxDeep sewer (check for required fall) unticked checkboxSeptic tank and leach drains
Alternative disposal system (detail): __________________________________
PROPERTY FENCING
Is fencing present? ticked checkboxYes unticked checkboxNo
ticked checkboxFence/s in good condition unticked checkboxFence/s in poor condition (describe): _____________
unticked checkboxFence/s to the (detail): ____________________________________
EXISTING RETAINING WALLS (detail on site plan)
unticked checkboxYes ticked checkboxNo
Condition of wall/s (describe): __________________________________________________
Retaining walls to the (detail): __________________________________________________
EXISTING STRUCTURES ON BOUNDARIES (adjoining property – detail on site plan)
unticked checkboxYes ticked checkboxNo
EXISTING SERVICES (detail on site plan)
unticked checkboxOverhead power ticked checkboxGas ticked checkboxCouncil drainage ticked checkboxSewer unticked checkboxFire
ticked checkboxWater ticked checkboxCommunication ticked checkboxReticulated water ticked checkboxUnderground power
ACCESS TO SITE (detail on site plan)
unticked checkboxGood access
ticked checkboxPoor access (describe): __________________________________
Will a temporary access be required? ticked checkboxYes unticked checkboxNo
CROSSOVER REQUIRED
ticked checkboxYes unticked checkboxNo
Are there services required where the crossover is located (detail on site plan)? unticked checkboxYes ticked checkboxNo
INDICATE TYPE OF EARTHWORKS
unticked checkbox for Diagonal line depicting a gently sloping site. unticked checkbox for Curved line indicating a mound within the site at building's proposed location. unticked checkbox for Straight horizontal line indicating a flat site. unticked checkbox for Diagonal line depicting a steeply sloping site
unticked checkbox for Stepped line with hashed area indicating  a cut and fill foundation for a sloping site. unticked checkbox for Horizontal line with a dashed curved line above it indicating that the top of the mound is to be removed. unticked checkbox for Horizontal line with a hashed area on top of it indicating a sand pad to be built on top of existing foundation. unticked checkbox for Dashed diagonal line with an angular solid line below it indicating a cut foundation for a sloping site.
ticked checkbox for Straight horizontal line indicating a flat site. unticked checkbox for Curved line indicating a depression within the site at building's proposed location. unticked checkbox for Diagonal line depicting a more steeply sloping site. unticked checkbox for Diagonal line depicting a sloping site.
ticked checkbox for Horizontal line with cut out below and shading above indicating an amount of existing foundation to be removed and a sand pad to be placed. unticked checkbox for Horizontal line above a curved line with a hashed area between the two indicating a depression to be filled. unticked checkbox for A zigzag line with hashed areas above and below it indicating substantial cut and fill required. unticked checkbox for A diagonal line with a hashed area above it showing a sloping site to be filled to create a level sand pad.

Reproduced with the permission of the Housing Industry Association Ltd.

IS IT A WET BUILDING SITE?
unticked checkboxYes ticked checkboxNo
ticked checkboxCouncil stormwater drainage system available
ticked checkboxStormwater to be contained on site (eg soakwells)
FINISHED FLOOR LEVELS TO BE RAISED
ticked checkboxYes unticked checkboxNo
ticked checkbox<= 200 mm
unticked checkbox> 200 mm
RETAINING WALLS REQUIRED
unticked checkboxYes ticked checkboxNo
unticked checkbox<1.0 m
unticked checkbox>1.0 m
STRUCTURAL ENGINEER DETAIL REQUIRED
unticked checkboxYes ticked checkboxNo
DEMOLITION REQUIRED (detail on site plan)
unticked checkboxYes ticked checkboxNo
unticked checkboxWhole building unticked checkboxPart of building
SITE MEASUREMENT
Proposed m² of building (m²) 178.29
Existing side boundary setback measured at (m) _______________
Proposed setback to rear boundary is measured at (m) 25.76
Distance from existing building to proposed building measured at (m) _______________
Pitch of existing roof measured at (m) _______________
Height of finished floor level to proposed building measured from datum 10.20
Distance to other existing outbuildings/structures measured at (m):
  1. patio _______________
  2. shed _______________
  3. swimming pool/s _______________
  4. gazebo _______________
  5. retaining walls _______________
  6. other (specify) _______________
Distance to any easements measured at rear of house (sewer) (m) 22.76
Distance to any services measured at (m):
1. sewer (furthest outlet to 1m from easement) 33.50
2. septic tank _______________
3. leach drain _______________
4. power supply 6.00
5. other(detail) _______________
COMMENTS
Rear right boundary peg missing, arrange with land surveyor for a re peg and establish finished floor level
from datum.
Both kerbing and footpath in poor condition. Take photos to present to the Local Authority for record. Organise
kerb/footing application and pay deposit.
Discuss with the Local Authority regarding the possibility of removing the verge tree if needed, establish a
contact for enquiries.
Discuss with the Local Authority connection requirements into their stormwater system, establish a contact for
enquiries.
Clarify details with Water Authority regarding the procedures relating to easements.
Discuss details with client regarding the proposed driveway. Need to establish a temporary access but can
use later as the base for the driveway.
Discuss the requirements with the Local Authority regarding the crossover specifications. Ensure person
responsible to construct the crossover is an approved contractor recognised by the Local Authority, so as
to receive a part refund on completion.
_______________________________________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
SITE PLAN
site sketch